CariDotMy

 Forgot password?
 Register

ADVERTISEMENT

View: 3877|Reply: 7

Tekno@MKST : Terowong terpanjang dibina di Switzerland

[Copy link]
Post time 17-10-2010 07:59 PM | Show all posts |Read mode
Terowong terpanjang dibina di Switzerland   
   
   
SEDRUN - Kumpulan jurutera Switzerland berjaya memecahkan batuan terakhir dalam pembinaan rumit terowong terpanjang di dunia yang mengambil masa 60 tahun, kelmarin.

Kejayaan itu disambut dengan bunyi trumpet dan sorakan di seluruh negara bagi merayakan pencapaian hebat itu.

Pemecahan batuan itu menandakan pembentukan terowong sepanjang 57 kilometer di Switzerland, sekaligus merampas rekod terowong terpanjang di dunia dari Jepun.

Pembinaan Terowong Gotthard Base itu dianggap pencapaian baru dalam penghasilan jaringan pengangkutan berkelajuan tinggi yang bakal menghubungkan setiap penjuru Eropah.:

Pertama kali dicadangkan oleh jurutera Switzerland, Eduard Gruner pada 1947, terowong itu bakal digunakan untuk penghantaran jutaan tan barangan yang pada masa ini dihantar menggunakan lori melalui pergunungan Alps.

Pembinaan terowong itu mempunyai kepentingan ekonomi kepada negara Eropah itu kerana memudahkan penghantaran barangan ke pelabuhan di Belanda dan Itali.

Terowong terpanjang di dunia itu juga dibina bagi mengurangkan kerosakan kepada landskap pergunungan Alps disebabkan oleh kenderaan berat yang melalui kawasan itu.

credit to sinar online
Reply

Use magic Report


ADVERTISEMENT


 Author| Post time 17-10-2010 08:27 PM | Show all posts


(The Gotthard Base Tunnel with the future Porta Alpina train station. On the left the temporary funicular)
Reply

Use magic Report

 Author| Post time 17-10-2010 08:29 PM | Show all posts
The Gotthard Base Tunnel

The GBT is part of the Swiss AlpTransit project, also known as New Railway Link through the Alps, which also includes the Lötschberg Base Tunnel. Today, 67% of the GBT has been excavated.

Like the Lötschberg tunnel, the GBT is intended to establish a direct route suitable for high-speed rail and heavy freight trains. The GBT will increase the maximum weight of trains on the route from 2,000 tons to 4,000 tons.

The two single-track tunnels will be linked by cross passages about every 325 meters so that each tunnel can serve as an escape route for the other. Two multifunction stations at Sedrun and Faido will house ventilation equipment and technical infrastructure and will serve as emergency stops and evacuation routes.

Diagram of Gotthard Base Tunnel

Reply

Use magic Report

Post time 18-10-2010 08:59 AM | Show all posts
SEDRUN - Kumpulan jurutera Switzerland berjaya memecahkan batuan terakhir dalam pembinaan rumit terowong terpanjang di dunia yang mengambil masa 60 tahun, kelmarin.


60 thn tu..jgn main2
careful planning for the sake of security
Reply

Use magic Report

Post time 18-10-2010 10:55 AM | Show all posts
kalah smart tunnel ni
Reply

Use magic Report

Post time 19-10-2010 10:40 AM | Show all posts
Reply 5# aku_EnSeM

smart tunnel kira okler
tp still boleh ker cope banjir besar?....

tu agaknye fungsinya yg sebenar selain kesesakan lalu-lintas
Reply

Use magic Report

Follow Us
Post time 19-10-2010 10:41 AM | Show all posts
lama tu...
Reply

Use magic Report

Post time 20-10-2010 04:59 PM | Show all posts
60 tahun
mak aihhh lama betul
Reply

Use magic Report


ADVERTISEMENT


You have to log in before you can reply Login | Register

Points Rules

 

ADVERTISEMENT



 

ADVERTISEMENT


 


ADVERTISEMENT
Follow Us

ADVERTISEMENT


Mobile|Archiver|Mobile*default|About Us|CariDotMy

22-11-2024 08:28 PM GMT+8 , Processed in 0.067071 second(s), 21 queries , Gzip On, Redis On.

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

Quick Reply To Top Return to the list